Twenty One Station Road
Nature of client end user business
Commercial Offices
CONTRACTOR
Emcor Engineering Services
PROJECT LOCATION
Cambridge, Cambs.
TIMING
On-Going Project
What the Project Entailed
The project consisted of pre-flushing, chemical cleaning and dynamic flushing of the low temperature hot water and chilled water systems for their modular offices, kitchen, meeting rooms and lecture theatre.
Pre-commissioning and balancing of the air and water systems was carried out and chlorination of domestic services. We fully flushed and commissioned the “shell and core” and then repeated the process and subsequently was awarded the “fit out” contract.
Specialist Treatment
There are approximately 360 4-pipe Ability fan coil units which are fully integrated into the building management system (BMS). These required careful commissioning and collaboration between ourselves, the BMS house and the manufacturer. The units have ePIV – electronic pressure independent valves, which are self-regulating.
All water treatment chemicals used are own label, custom made to suit customer specifications.
What We Brought to the Job
We have enjoyed a successful, long term relationship with Emcor which led us to being selected to carry out the specialist water treatments and consultancy work on this project because of our expertise and knowledge of building systems.
Danny’s actions and energy helped made us look good and the project go smoothly…Having Comfort nominated for all water treatment works, we really did stumble across a gem. I wanted to bring this to your attention as I’m sure you will agree, sometimes someone deserves a pat on the back in the industry we work in. Thanks Danny and the team!
David Spencer
Direct Cooling Systems Limited